The Design Development Submission Drawings are completed and in the review process.Facilites and FIP have been meeting with the clients to review their IT requirements.
There has been discussion with the AV group in reviewing the locations in the buildings that will be utilizing AV equipment.Addtional meetings with the NE group to review the IT telecomm locations and the MDF layout.
There have been discussions with ITV on their needs for the building.There was a meeting with the AV group to review the main conference room design from Mediatech. Another meeting is scheduled for February 27th with the AV group and Dr. Pinkney for his expextations of the conference room.
A meeting is setup on March 4th with IT groups and facilites to review any of there concerns and questions related to the Bioscience building IT equipment.