Reviewing the IT staging and cubicle space in lower level with client.
Reviewed voice requirements and the estimated number of fiber to the building with network services.
A meeting was held to discuss the phone system for the GT BE project and the design criteria used. The focus of the meeting is to gain a better understanding of VoIP technology and how the new technology may directly impact the BE building project (and others) in terms of building system requirements.
A site walkthrough to visit the IT vault, the SA MDF, and generator location, and conduit path into the SA MDF.
Met with the IT security and Network Services discussing wireless printing solution for academic college laptops.
No comments:
Post a Comment