Received the 95% construction drawings.
Reviewing the 95% construction drawings.
Setup meeting with other IT groups to review the construction drawings.
Setup a time to review the 95% CD for comments.
Prepare an FIP meeting to review the 95 % Construction Drawings.
Scheduled review of construction drawings with the FIP for June 29th.
Scheduled review of construction drawings with the NE team for June 29th.
Scheduled review of construction drawings with the Telephone team for June 29th. Scheduled review of construction drawings with the AV team for July 13th.
Scheduled review of construction drawings with the ITV team for July 13th.